Home

From Wikibon

(Difference between revisions)
Jump to: navigation, search
Line 4: Line 4:
'''''Six Wikibon experts break down EMC's recent analyst event''''' (23 Mins)
'''''Six Wikibon experts break down EMC's recent analyst event''''' (23 Mins)
-
{{Click||image=Icon_listen.gif|link= Media:12-16-08_EMC_Peer_Incite_mashup.mp3 | width=67px|height=16px}}
+
{{Click||image=Icon_listen.gif|link= Media:12-16-08_EMC_Peer_Incite_mashup.mp3 | width=60px|height=14px}}
*[[EMC: Do the rich get richer in 2009?|Read the summary notes from this meeting]]  
*[[EMC: Do the rich get richer in 2009?|Read the summary notes from this meeting]]  
Line 33: Line 33:
[[Storage virtualization design and deployment | read more...]]
[[Storage virtualization design and deployment | read more...]]
|}
|}
 +

Revision as of 04:04, 23 December 2008


Latest Peer Incites:

Six Wikibon experts break down EMC's recent analyst event (23 Mins)

Media:12-16-08_EMC_Peer_Incite_mashup.mp3

Grant, a Sr. Storage Admin at a large bank discusses how heterogeneous storage virtualization can help reduce the budget for 2009. (20 Mins)

Media:11-18-08_Peer_Incite_mashup.mp3‎

Wikitip

Implications of EMC's July 2007 platform announcement

EMC’s big announcement ushers in a new period of important negotiations, but no big storage revolutions. EMC loses no ground where it’s strong (high-end/midrange) and makes up a bit where it has been behind (IP storage). However, not even improvements in the energy footprint of EMC’s portfolio should distract users from the goal of meeting tactical storage needs at the optimal price.

View Another Wikitip

Featured Case Study

Virtualization Energizes Cal State University

John Charles is the CIO of California State University, East Bay (CSUEB) and Rich Avila is Director, Server & Network Operations. In late 2007 they were both looking down the barrel of a gun. The total amount of power being used in the data center was 67KVA. The maximum power from the current plant was 75kVA. PG&E had informed them that no more power could be delivered. They would be out of power in less than six months. A new data center was planned, but would not be available for two years.

read more...

Storage Professional Alerts


Featured How-To Note

Storage Virtualization Design and Deployment

A main impediment to storage virtualization is the lack of multiple storage vendor (heterogeneous) support within available virtualization technologies. This inhibits deployment across a data center. The only practical approach is either to implement a single vendor solution across the whole of the data center (practical only for small and some medium size data centers) or to implement virtualization in one or more of the largest storage pools within a data center.

read more...






























Personal tools