Home

From Wikibon

(Difference between revisions)
Jump to: navigation, search
Line 8: Line 8:
[[Image:Leumi.jpg|250px]]
[[Image:Leumi.jpg|250px]]
==[[Leumi Bank road tests XIV|Leumi Bank Road Tests XIV]]==
==[[Leumi Bank road tests XIV|Leumi Bank Road Tests XIV]]==
-
<p style="color: #666;">...took advantage of the need to replace aging IT equipment on the data center floor to modernize its operations and architecture both for improved efficiency and elimination of single points of failure.</p>
+
<p style="color: #666;">Leumi Bank has grown to be one of the largest commercial banks in Israel, and is growing fast internationally. Itzik Reuven is the storage administrator, and manages the data center storage for over 12,000 employees in 21 countries. He managed a broad smile when Wikibon spoke to him about his XIV experiences in Montpellier, France. </p>
-
[[Berry College IT goes green | read more...]]
+
[[Leumi Bank road tests XIV storage arrays | read more...]]
| valign="top" |
| valign="top" |
{{Storage professional alerts 2}}
{{Storage professional alerts 2}}
Line 21: Line 21:
[[Planning a green storage initiative | read more...]]
[[Planning a green storage initiative | read more...]]
|}
|}
-
[[Category:Business compliance]]<br />[[Category: Storage disaster recovery]]<br />[[Category: Storage vendor management]]<br />[[Category: Wikitips]]<br />
+
 
 +
[[Category:Business compliance]]<br />[[Category: Storage disaster recovery]]<br />[[Category: Storage services]]<br />[[Category: Storage vendor management]]<br />[[Category: Wikitips]]<br />

Revision as of 15:28, 13 September 2008

Wikitip

[[]]

View Another Wikitip

Featured Case Study

Leumi Bank Road Tests XIV

Leumi Bank has grown to be one of the largest commercial banks in Israel, and is growing fast internationally. Itzik Reuven is the storage administrator, and manages the data center storage for over 12,000 employees in 21 countries. He managed a broad smile when Wikibon spoke to him about his XIV experiences in Montpellier, France.

read more...

Storage Professional Alerts


Featured How-To Note

How to plan a green storage initiative

While technology changes have decreased footprint, power loading (amount of power required for a square foot of data center space) and heat load (the amount of heat that has to be removed from a square foot of data center space) have both escalated dramatically. The result is higher energy costs to provide power and extract heat from the data center, and lower utilization of data center floor space because of power and cooling limitations. The technology trends are toward higher heat and power loading, which will exacerbate the problem.

read more...






Personal tools