Portal:Storage
From Wikibon
The Wikibon Data Storage Portal contains data storage industry research, articles, expert opinion, case studies, and data storage company profiles.
Latest Information Storage Research
![]() | ![]() | ![]() | ![]() | ||||
---|---|---|---|---|---|---|---|
>>Join our Group | >>Become a Fan | >>Follow @Wikibon | >>Read the Blog |
WikitipDemartek Low Latency Evaluation of Fibre Channel iSCSI and SAS Host InterfacesDemartek announces its evaluation of low latency host storage interfaces, comparing Fibre Channel, iSCSI and SAS for the same storage system. Block host interfaces, including Fibre Channel, iSCSI and SAS are all becoming increasingly available for today’s storage systems. While high IOPS is frequently the metric for assessing drive and array performance, in many cases latency is equally as important. For example, in an OLTP application, short response times are critical. A transaction may require many successive queries to a database, where each query depends on answers returned from the previous query. User response times are entirely dependent on how quickly storage can return answers to the queries. “We compared four interfaces, 8Gb Fibre Channel (FC), 10Gb iSCSI, 1Gb iSCSI and 6Gb SAS on the same storage system looking for IOPS and latency differences,” said Dennis Martin, Demartek President. “At first glance, one might assume that the interfaces with the highest line rates would provide the best overall performance, but we found that this was not the case. We found that the best overall IOPS and latency performance for this storage system was with the 6Gb SAS host connection, followed very closely by the 8Gb Fibre Channel host connection.” The complete report is available on the Demartek low latency evaluation report page on the Demartek website. |
Featured Case StudyVirtualization Energizes Cal State UniversityJohn Charles is the CIO of California State University, East Bay (CSUEB) and Rich Avila is Director, Server & Network Operations. In late 2007 they were both looking down the barrel of a gun. The total amount of power being used in the data center was 67KVA. The maximum power from the current plant was 75kVA. PG&E had informed them that no more power could be delivered. They would be out of power in less than six months. A new data center was planned, but would not be available for two years. |
|
Featured How-To Note |
Storage Virtualization Design and DeploymentA main impediment to storage virtualization is the lack of multiple storage vendor (heterogeneous) support within available virtualization technologies. This inhibits deployment across a data center. The only practical approach is either to implement a single vendor solution across the whole of the data center (practical only for small and some medium size data centers) or to implement virtualization in one or more of the largest storage pools within a data center. |